ISO factory cooker manufacturing 2 burner cooking stoves gas cooker stove modern RD-GD310
ISO factory cooker manufacturing 2 burner cooking stoves gas cooker stove modern RD-GD310
ISO factory cooker manufacturing 2 burner cooking stoves gas cooker stove modern RD-GD310. We are the best kitchen appliance factory providing high-quality, efficient, and durable cooking stoves. Buy now for a modern cooking experience.
Left 125mm steel 8 eyes burner. Right 100mm cast iron honeycomb burner, gold color.
4
Pan Support:
5 ears silver pan support, electroplate
5
Water Tray:
Stainless steel water tray
6
Ignition:
Automatic ignition
7
Gas Pipe:
11.5mm gas pipe, I shape connector
8
Knob:
PP black knob
9
Foot stand:
PP foot stand
10
Packing:
Plastic bag + 5 layers color box
11
Gas Type:
LPG
12
Carton Size:
715x385x95mm
13
Loading QTY:
20GP/1150pcs, 40HQ/2720pcs
1. Water washing after swimming: For the electrophoresis processing line without UF water washing, it is necessary to replace the water washing after electrophoresis in time to prevent dry paint stains and secondary flow marks. 2. Off line: For the line with a short time of draining, it is recommended to add compressed air to blow water at this station to prevent the workpiece from entering the drying tunnel and forming water marks. For lines with high requirements on the appearance of paint film, manual spraying and water washing can be added at this station, and then the lines can be drained or blown. 3. Drying: the current common method of heating air circulation is convection method. The continuous production line mostly adopts bridge drying channel, and the intermittent production line mostly adopts channel type, Even some small electrophoresis processing plants have a large oven. The heating sources include coal, natural gas, diesel oil, electricity, etc. The form of down air supply and up air extraction is often used. The hot air must be filtered, The combustion chamber (furnace) shall be separated from the drying tunnel to prevent the introduction of soot particles. During daily production, attention should be paid to the cleaning of the drying path to prevent the occurrence of particles or lampblack from dropping and forming oil shrinkage holes; It is necessary to conduct regular and comprehensive cleaning to prevent fire risk. 4. Black electrophoresis processing sewage treatment: the discharge of electrophoresis processing sewage is relatively large, so it is recommended to have supporting sewage treatment equipment, and sewage must not be directly discharged.
Teflon cold sheet panel, 035*025mm thickness
Left: 125mm steel 8 eyes burner
Right 100mm cast iron honeycomb burner, gold color.